You can see the progress on the roof from this view. First, the 2x6 inch ceiling boards are covered with plastic, then come the 4 inch foam insulation sheets, 2x4 boards on top of that, OSB boards, then the black felt (or tarpaper as I've always heard it called), and eventually the metal roof material will go over that. I don't know if there are other things before the metal roof or not, but I haven't heard of it if there is.
You can see here that the outer edge of the roof doesn't require insulation. It isn't over heated or cooled areas since it's just overhang on the sides.
Now that the scaffolding has now been moved outside you can see the great room a little bit better.
I went up there to see the progress on Friday too, but the crew hadn't gone up there at all since it was raining in the morning where they were (about an hour and a half south of here). It hadn't rained on the mountain so I just spent the time picking up garbage and hauling it off.
I haven't been able to get the hi-tech guy from Crabtree Computers to call me back lately so I haven't been able to set up a meeting between us, Will Parker of the smart-home place, and Steve Pearson to make sure that we aren't forgetting something now that might prevent us from doing things later that we might want to do (even though we may not be able to afford to do them)! I've left 2 messages over the last week or so and haven't had a return call yet!
It's supposed to rain Monday and Tuesday so I don't know whether Steve and the crew will even come up there or not. We'll see!