Thursday, August 21, 2008

2008_07_10 Stair rails have arrived

The rails that go inside around the stairs and around the deck outside arrived at long last. They started putting the inside ones around the stairs first since they were trying to finish the work inside as soon as they could.

Below the post at the top of the stairs is being put into the loft floor. The post has a threaded bolt in the center of it and it will be screwed down into that hole that is being drilled.


The picture below shows them checking to make sure that the railing at the edge of the loft is plumb before attaching it to the log support post.


No comments: